Loading...

Office 3 St. Paul’s Place, Sheffield

Project Overview

Office 3 St Paul’s Place, Sheffield is the latest addition to this already successful landmark City Centre location. Number 3 is the new, striking, high-spec office building offering BREEAM Excellent space in the very heart of Sheffield.

This project is a 12-storey, 60,000 sq ft office building. An in-situ concrete frame with reinforced concrete flat slabs provides the structural solution to podiums at first floor level, with an integrated services structure solution for the upper 10 storeys. Car parking and service areas are provided to the basement.

Challenges/Solutions

A steel frame structure was the obvious solution for the office levels above first floor. Using long-span beams meant that the internal columns could be eliminated to provide a clear, open-plan office space around the central core.

The use of cellular beams allowed services integration within the floor structural zone in order to keep the overall floor depth and storey height to a minimum. The beams are designed to act compositely with the concrete floors slabs to deliver an efficient and economic frame. Stability is provided by the concrete shear walls around the central lift and stair core.

A key feature of the building is the exposed concrete columns at ground level. The columns were sand blasted to produce an exposed aggregate feature finish.

These support the perimeter steel columns above and are inclined outwards in order to reduce the requirement for transfer structure at first floor. The decision was made to adopt an in-situ reinforced concrete frame up to first floor level as it was considered that this would best resolve the lateral forces due to the inclined columns and the transfer requirement at first floor.

A contiguous piled retaining wall is provided to two sides of the site to form the basement. This diminishes in height to suit the site levels. The ground conditions consist of three layers: made ground over weathered mudstone over mudstone bedrock. The site had been extensively worked for coal and many former bell pits required grouting. An insitu reinforced concrete raft foundation selection was adopted as the most efficient way to distribute the loads across the footprint of the building and because of site space constraints the tower crane foundation was included in the building raft foundation.

Project Details
ProjectOffice 3 St. Paul’s Place, Sheffield
DisciplineStructural Engineering
ClientCTP Limited
ArchitectHodder + Partners
Project Duration2014 - 2016
Value£16m
Download Project
Previous Project
Clippers Quay, Salford
Next Project
St. John’s Quarter, Manchester
Our Values
  • Listen We ensure that we listen to what our clients say about their needs, objectives, programme, resources and budget.
  • Understand We make sure that we understand the client’s brief, undertake rigorous analysis and challenge all assumptions.
  • Innovate We design practical, innovative solutions to minimise cost without sacrificing quality, so that money is spent where it matters.
  • Create Working closely with the design team and contractors, we deliver the client’s vision on time and on budget.
  • Deliver Our approach ensures that our clients trust us and are confident in our ability to deliver.

RoC Consulting
Commercial Wharf
6 Commercial Street
Manchester
M15 4PZ

0161 214 5390 info@rocconsulting.com

RoC Consulting
Get Directions

NCP Stone St
Get Directions

NCP Car Park Manchester Central
Get Directions

NCP Car Park Manchester Bridgewater Hall
Get Directions

NCP Car Park Manchester Chester Street
Get Directions